GARBAGE CHUTE SPECIFICATIONS. For 60cm,dia,30 litre Hopper Door

garbage1. The garbage Chute will be 60 cm diameter manufactured from Stainless Steel,1.5mm thicknessType 304 SD to comply with BS 1703/or local requirements.

2. Hopper Doors will be provided at every floor 57 x 73 cm frame size, 45 x 45cm net opening, 30 litre capacity, self closing type with rubber frame seal and provided with operating instructions labels. The hopper doors will bemanufactured completely from Stainless Steel.

3. 100% Stainless steel Hopper Doors will be provided with Indicator lights and Electro-magnetic locks to close off the chute during maintenance and cleaning.

4. Hopper Doors are connected to the garbage duct with 1.5mm connecting element such that the duct is located at 15cm from the external door frame.

5. At every floor Cleaning Sprinkler will be provided connected to water tank on the roof by a vertical copper pipe. A Disinfecting and sanitizing unit is provided which injects disinfectant into the water supply to enable automatic disinfecting of chute during the cleaning process. The system is activated by an electrically operated solenoid valve.

6. A Control Panel is provided the access housing door to operate the washing system and to control the electro-magnetic locks, exhaust fan operation and sprinklers.

7. A 9" fan with special fittings will be provided on the top of the duct to extract bad smell.

8. A 100% Stainless Steel water proof fire cut off door will be provided at the bottom of the chute fixed under the first floor slab. The fire door is operated by a fusible link set at 150degF which breaks in the event of a fire breaking out in the refuse room. Also supplied will be an automatic fire extinguishing system with spray heads at every floors.

9.Offsets will be manufactured from 2mm thickness Stainless steel reinforced in impact areas by a further 2mm stainless steel sheet welded in position.

10.2 No's 100% Galvanized garbage containers will be provided complete with 4 wheels of 1.1cum capacity suitable for Muncipality Trash collection vehicle.

11.All external surfaces of the chute will have an application of a special fire retardant paint of 2mm thickness to eliminate sound and leakage and to prevent oxidization.

NOTES:

* Floor Slab Opening of 70 x 70cm Minimum at each floor level and of size 35 x 35cm at the Roof level shall be provided by the Main Contractor.
* 13 AMP socket to be provided at the ground floor garbage room [ For Electric Programmer Panel}.
* Blockwork around the chute shall be constructed by the contractor only after the installation of the chute.
* Ground floor garbage room should be 200cm width and 400cm length.
* Ground garbage room entrance door should beprovided minimum 150cm width and outside opening.
* All garbage room floors entrance door should be openoutside
.garbage

 

1.1 /2.5 & Cubicmeter 9(CBN) Galvanized Garbage Containers

garbageMaterial & Characteristics

  • Compatible with Municipality standard & Private DIN waste collection trucks.
  • Hot Dip Galvanized steel body for maximum protection.
  • Sturdy design for long & durable life.
  • Spring loaded sliding dome lid for ease of working.
  • Rubber hand guard seals the container lid & prevents unpleasant odors.
  • Handles for ease of maneuvering.
  • Solid rubber wheels 4nos. for quite movement.
  • Two wheels providesd with anti skid brakes for easy positioning
  • Drain plug at the bottom for easy & convenient cleaning.